How long until sync is completed? I open my Help:Activity Log window and watch the scroll as the % completion is displayed.
Since the sync process makes the client unresponsive, the log scroll adds confirmation that the process is not hung.
The problem is I must open this log each time, simply to watch the % saved increase in the scroll, I don't need a window that size or the options to save off the log.
I need feedback if I'm syncing successfully and an eyeball rate of sync so I can manage other tasks why the sync occurs.
Therefore, adding a single line scroll to the interface that is automatically rendering the activity log output would passively display an animated increasing sync percentage.
The same effect I get from watching the fast scroll animate the sync % in the pop up, only passively displayed in the corner of a frame somewhere. ?
Idea
bradkrause67 1
How long until sync is completed? I open my Help:Activity Log window and watch the scroll as the % completion is displayed.
Since the sync process makes the client unresponsive, the log scroll adds confirmation that the process is not hung.
The problem is I must open this log each time, simply to watch the % saved increase in the scroll, I don't need a window that size or the options to save off the log.
I need feedback if I'm syncing successfully and an eyeball rate of sync so I can manage other tasks why the sync occurs.
Therefore, adding a single line scroll to the interface that is automatically rendering the activity log output would passively display an animated increasing sync percentage.
The same effect I get from watching the fast scroll animate the sync % in the pop up, only passively displayed in the corner of a frame somewhere. ?
Link to comment
11 replies to this idea
Recommended Posts
Archived
This topic is now archived and is closed to further replies.